On 11 July 2025, exactly one year passed since we put our 710.6 kWp photovoltaic power plant at our production facility in Žamberk into full operation. The system also includes a 230 kWh battery as a part of the electricity generation setup. Over the course of 12 months, we successfully produced 694 MWh of electricity, resulting in saving 356 tons of CO₂.
In addition to the positive environmental impact, this achievement has significantly lowered our energy costs and allowed us to participate in a surplus electricity sharing system. Since January 2025, the electricity we generate has also been helping the ALBERTINUM Medical Institution in Žamberk.
An investment that makes sense – environmentally, economically, and socially.